AP1
Asphalt Mix Conception
Jan – Oct 2025 · Lead: B2SQUARE / ASC
Characterisation of bio-bitumen and recycled aggregates, development of innovative mixing processes, and strategic integration of recycled asphalt pavement (RAP) with up to 50% content.
AP2
Innovative Additives for Sustainable Asphalt
Jul 2025 – Jun 2026 · Lead: RWTH Aachen
Selection, laboratory evaluation, and integration procedures for recycled and eco-friendly fibres. Includes CT-scan analysis of homogeneity and fibre distribution.
AP3
Construction & Environmental Compatibility
Jan 2026 – Nov 2027 · Lead: B2SQUARE
Full life cycle analysis (LCA) of bio-bitumen production from cashew shells, field trials at RWTH Aachen test track, and ongoing long-term performance monitoring via X-ray CT and FTIR.
AP4
Large-Scale Validation & Public Road
Oct 2026 – Nov 2027 · Lead: B2SQUARE
Construction of 2×50m test sections at duraBASt, accelerated load testing with the MLS 30 mobile load simulator, and implementation on a public road in Nörvenich.
AP5
Coordination & Dissemination
Jan 2025 – Dec 2027 · Lead: ASC
Project coordination, publications in Construction and Building Materials, Journal of Cleaner Production, and presentations at TRB 2026 and Eurobitume 2026.
→
Results expected from 2026
Ongoing
Scientific publications, field trial data, and LCA reports will be published here as results become available. Subscribe for updates.